What is the Mt. Tabor Road Restoration and Pedestrian Safety Project?

The Mt. Tabor Road Restoration and Pedestrian Safety project includes nearly 1.1 miles of new road construction, full curbs, gutters, and sidewalks. The need for this project is clear, considering the renewed surface cracking and foundation shifting occurring near the Slate Run creek slopes, along with the lack of any pedestrian facilities along the roadway. This project will provide a much needed reconstructed road that will aim to improve both pedestrian safety and provide traffic calming mechanisms.

Additionally, this project will provide a long-term solution to the road-erosion and safety issues on Mt. Tabor Road.  Over 2 years ago, a slide occurred on the hillside of Mt. Tabor Road.  The City provided a temporary solution to the road failure and erosion issues 2 years ago, and this new federally funded project (80% federal funding, 20% local funding) will ensure that a long-term solution is in place that keeps residents and families in the neighborhood safe. The total anticipated cost for the Mt. Tabor road reconstruction project is about $6.5 million, with the city’s 20% percentage being about $1.3 million.

The original plans for improvement to the area called for a roundabout at the intersection of Mt. Tabor Road and Klerner Lane. After receiving feedback from residents and neighbors, this roundabout has been removed from the project for other options (see below).

Important Documents Regarding the Project

Click on the name of the document that you would like to view.